Apply alternative routing

  • Updated

This tool is designed to help you efficiently transfer production orders from the standby resource to a dedicated machine center, while simultaneously seeking the best alternatives to achieve the earliest completion.

The function "Apply AlternativeRouting" is accessible viathe bar's context menu:

By selecting this option, the operations of a production order are added to the schedule starting no earlier than the current work date, or later if required by a linked predecessor, without altering the existing schedule. The system will ensure the order is completed as early as possible by utilizing the alternative routing you have defined.

VAPS-apply-alternative-routing.gif

The core principles behind the "Apply Alternative Routing" function

  • Changes the assigned machine center of the triggering operation and all successors (move from standby to a concrete machine center).
  • Changes the timing (start date, hence: end date) of all successors.
  • Adds this production order with the lowest priority applying an ASAP strategy
  • Will not change the sequence on any machine.
  • Will not violate the routing structure.