this can be either personnel doesn't have resource available in his FDC tab

Or WO is not set as APS planned

This can be changed also in configuration wizard
Or operation type doesn't have times selected

this can be either personnel doesn't have resource available in his FDC tab

Or WO is not set as APS planned

This can be changed also in configuration wizard
Or operation type doesn't have times selected

Comments
0 comments
Please sign in to leave a comment.