  • Produce Manager - Ability to correct timings and postings

    Is there a way for the produce manager to approve the times/quantities of items used prior to the receipt from production being completed. The user would like to be able to do this in the cloud app...

    • 1 follower
    • 0 comments
    • 0 votes
    • Answered
  • Produce Manager - multiple managers

    Hi. Would it be possible to have multiple managers who each have their visibility (dashboards and production orders) limited based on a warehouse or group of resources.

    • 2 followers
    • 1 comment
    • 0 votes
    • Answered
  • Produce & Inspect Dashboards within cloud apps

    Hi Is there scope to be able to add/customise these dashboards.  It would be beneficial in produce to be able to see a quick glance the times the operator has booked against the time for the order.   

    • 2 followers
    • 2 comments
    • 0 votes
    • Answered
  • Boyum & Cryptocurrencies

    I was wondering if Boyum had any future plans concerning obtaining more APIs for the exchange rate configuration, such as XE (this covers all the standard, and many cryptocurrencies). At present th...

    • 2 followers
    • 1 comment
    • 4 votes
    • Answered
  • Produce Operator - Further Traceability

    It would be beneficial for operators to see the batch attributes field - in case they need to assign additional information to these, or any UDFs which have been created. Some of our clients have U...

    • 4 followers
    • 2 comments
    • 4 votes
  • Production Kanban Board

    It would be useful to have production orders as a Kanban board, so orders can be moved between production lines, and the order amended within SAP to show the new resource

    • 2 followers
    • 1 comment
    • 4 votes
    • Planned
  • Produce Manager - Which production line

    Our client would like to see which production line the production line has been raised for, so they then can set a priority for each production order on each line.

    • 2 followers
    • 1 comment
    • 2 votes
    • Planned
  • If inspection order fails

    would it be possible to trigger an inspection plan, based off a failure of a test

    • 2 followers
    • 2 comments
    • 1 vote
  • Inspection Plan - Not progressing to next step

    would it be possible for an inspection plan not to move onto the next inspection plan until it is completed and passed

    • 2 followers
    • 2 comments
    • 1 vote
  • Inspect Visibility

    in inspect would it be possible to have the visibility feature (as in produce), as certain operators may only do qc checks relevant to their areas (for instance – goods in will check any goods comi...

    • 2 followers
    • 1 comment
    • 1 vote