If inspection order fails
would it be possible to trigger an inspection plan, based off a failure of a test
1
-
Hi Nicole,
This will come. If necessary, a proposal for an additional test which must then be confirmed. Like a notification.
But do you think a new inspection order or an additional sample?
Tino
-
Hi Tino
Or could a process flow diagram be built in to the system which allows the customer to setup the process so if it fails because of x then do y, but if it fails on z, then do a etc.
Please sign in to leave a comment.
Comments
2 comments