
Christian Hauff
- Total activity 107
- Last activity
- Member since
- Following 0 users
- Followed by 0 users
- Votes 57
- Subscriptions 40
Activity overview
Latest activity by Christian Hauff-
Christian Hauff commented,
Yes, and now try to see them in the webapp. And next (hopefully) to come: post pdf (like contruction drawings), please.
-
Christian Hauff commented,
Yes, it would be awesome to have the constrution pdf on the webapp 2.1. Especially connected to the sequences that I have started.
-
Christian Hauff created a post,
APS an WebApp 2.1
It is not possible to post the sequence for a ressource order by start time. (except in the pool) So all the work with the APS ist invain, because the results can´t be posted on the webapp. The com...
-
Christian Hauff created a post,
Item Display in order recommendation and invent. History
In the order recommendation you can see for which item the material is need only for sales orders (see 1). This information is missing for production orders (see 2). Also in the invent.History y...
-
Christian Hauff created a post,
Data hub - field ext_unit for units of measure groups
Missing field; field ext_unit in the data hub to import BOM. When using units of measure groups to import articles into the BOM you need this field. Especially when having calculations with price p...
-
Christian Hauff created a post,
Pre-assign when choosing absence
When selecting a date on the personal calendar window for setting an absence the edit-windows jumps back to the system date. Isn´t easy to copy from the calendar the date to the edit window? It is ...
-
Christian Hauff commented,
Hi Ana yes we have pool of human resources and a pool of machines. As machine needs human they must be available, planned and start at the same time.
-
Christian Hauff created a post,
F9317-Operation sequence with parallel pool resource include APS
AnsweredWe have pools of workers and pools of machines. To get them started equal we like to use the parallel resources in the operation sequence. So we need the function in the operation sequence and in t...
-
Christian Hauff commented,
-
Christian Hauff created a post,
Individual order in the work order transaction view
AnsweredCustomers need to arrange the work order view. Primary the top of a document, project number before sales order.