User

Andre Schoenebeck

Member since
Total activity 16
Last activity
Following 0 users
Followed by 0 users
Votes 2
Subscriptions 6

Posts

Recent activity by Andre Schoenebeck

  • Personnel - holiday planning, crew management

    Currently, planned absences can be entered only per employee Request: enter holidays or other absences for several employees at once, graphical calendar view for manpower scheduling for the complet...

    • 5 followers
    • 0 comments
    • 7 votes
  • Variable density

    Various material can have significant density changes depending on temperature, moisture etc. Currently, we have only a fix conversion of UoM for density saved to item master. Request: use the fiel...

    • 2 followers
    • 1 comment
    • 3 votes
    • Not planned
  • BoM with 40 levels

    BoM with 40 levels needed. Currently, there is a limitation of 21 levels. Item structures wìth >21 levels can be created, but if a WO is created from such a structure only the first 21 levels are c...

    • 2 followers
    • 1 comment
    • 0 votes
    • Answered
  • Post-calculation with more info

    Fill the post calculation structure window with more information on the right next to COGS plan/actual display per row information from recent time receipts, used material. Similar to WO structure....

    • Edited
    • 4 followers
    • 5 comments
    • 2 votes