F9317-Operation sequence with parallel pool resource include APS

Answered

Comments

4 comments

  • Ana Bracho

    Hi Christian

    When you say "To get them started equal ", do you mean start the clock in of an operation and all parallel resources related at the same time ?

     

  • Christian Hauff

    Hi Ana

    yes we have pool of human resources and a pool of machines.

    As machine needs human they must be available, planned and start at the same time.

  • Ana Bracho

    Thanks to clarify

    It was add it in our list of task to analyze in detail.

    Best regards.

  • Mounir AHANGUIR
    Hi Everyone,
    We have the same needs
    Is there a solution to that ?
     
    Regards,
    Mounir