20 May 2026
| Product | Visual Jobs Scheduler |
| Version | 1.27 |
| Build | 1.27.0.1 |
List of fixed bugs
- Job Planning Lines created after the use of "Split Job Planning Line" did not behave properly.
- These Job Planning Lines will now have the right resource description set when moved to another resource.
- These Job Planning Lines will now have the correct interaction when they are linked to other elements and are moved directly after creation in a way that would trigger a scheduling interaction.
- These Job Planning Lines will now have the correct behavior when saved and interacted with directly afterwards.