13 August 2026
| Product | Visual Jobs Scheduler |
| Version | 1.27 |
| Build | 1.27.0.2 |
List of fixed bugs
- “Line Amount” and “Total Cost” were not calculated correctly on the newly created Job Planning Line after the use of “Split Job Planning Line”.
- The date format used in the curve tooltip did not respect the current location.