Start/stop feature for resources within the same route stage Answered

Matthew Froehlich

We have different resources within a route stage.  (metal forming route stage contains both shearing and bending as a resource). There is a not a way for Boyum to capture the time for each operation without the operator manually entering. It would be great to select the resource and start/stop within that route stage)

Comments

3 comments

Please sign in to leave a comment.