Start/stop feature for resources within the same route stage
AnsweredWe have different resources within a route stage. (metal forming route stage contains both shearing and bending as a resource). There is a not a way for Boyum to capture the time for each operation without the operator manually entering. It would be great to select the resource and start/stop within that route stage)
1
-
Hi Matthew,
i would like talk with you about this request, can you sent me your email address?
Many thanks Tino
-
Hi Matthew, your email address is not working matt.froehlich@flascho.com. Is the address correct?
Tino
Please sign in to leave a comment.
Comments
3 comments