QC order for semi-finished Answered
Hello,
I have prepared a BOM with a semi-finished product. The intermediate is set to make-to-order and the main product is set to make-to-stock production. A quality plan is set up for both indexes and both indexes are batch managed. Can the system be configured in such a way that a quality control order is automatically created after the receipt of the semi-product into the warehouse?
the screen has a view of the production order, where the batch has been created with the status - Unable to access. I would like a quality assurance order to be created automatically when this batch is received. 
Comments
4 comments
Hi Robert
i don't know if i'm understanding this correctly.
create a QC plan and link to SA324
regards
Martin
Hi Martin,
QC plan is linking to SA324 for all documents, is the same for SA325 and is not created automatically QC order.
Best regards,
Robert
Hi Martin,
One more question: why not auto-create a batch number with the following settings.
M{count=0123456789,count1=ABCDEFGHIJKLMNOPQRSTUVWXYZ,len=6,pattern=110000,setup=bat1,start=AA0000}
Purchesing batch number creates well with a similar setting:
L{count=0123456789,count1=ABCDEFGHIJKLMNOPQRSTUVWXYZ,len=6,pattern=110000,setup=bat,start=AA0000}
Regards,
Robert
Hi Martin,
I solved the last question. It turned out that the batch parameter in the item master data must be set to automatically created batches.
Please sign in to leave a comment.