Produce - Production downtimes
PlannedRecording of production downtimes. Downtime reasons can be defined via the manager. The operator can report a shutdown. If the work is continued, a downtime reason must be assigned. The reasons and times are visualized in the dashboard. The data can be made available for additional individual analyses.
Please give your vote if interesting.
10
Please sign in to leave a comment.
Comments
0 comments