Skip to main content

Pool report on parallel routes

Answered

Comments

1 comment

  • Yaremi Miranda Lopez

    Hello Peyman,

    If you selected these operations as parallel, then it means that you can "work" on them at the same time and this is why you can see them in the pool report. 

    What is the result you want to achieve? Why are you defining this as parallel?

Please sign in to leave a comment.