Shelf Life in months
In some cases in recomendy that the expiration date was production date + shelf life (in months).
We need to put the shelf life in months for the system (BEAS) works same as the printing machine.
For example:
ítem A, with a shelf life 91 days (3 months)
Production day 31/08/2018
o Expiration day for machine: 31/08/2018 + 3 months = 31/11/2018 CORRECT
o Expiration day for BEAS: 31/08/2018 + 91 days = 30/11/2018 INCORRECT
ítem A, with a shelf life 92 days (3 months)
Production day 31/08/2018
o Expiration day for machine: 31/08/2018 + 3 months = 31/11/2018 CORRECT
o Expiration day for BEAS: 31/08/2018 + 92 days = 01/12/2018
INCORRECT
1
Please sign in to leave a comment.
Comments
0 comments