Material should be replaced in in the cost estimation
now in beas Material can be replaced in the work order, but not in the cost estimation
it should be replaced in cost estimation
0
-
Hi,
the original cost estimation was calculated with material 1if i need more time, more or other material, then this don'd has to change the cost estimation. This is the idea from Pre calculation (before production) and Post calculation (after production)
What is the idea behind your request?