Skip to main content

Produce | Manager - Production order backlog management via a Kanban flow

Planned

Comments

2 comments

  • Elizabeth Cameron

    I'm not sure if this is similar to the above request, but I also would love to see dependent sequences enforced.

    For instance, operator A works on route stage 1 and operator B works on route stage 2.  Route stage 2 is dependent on route stage 1.  So operator B does not see the task for route stage 2 in his queue until route stage 1 has been completed.

    - Beth

  • Tino Schaloske

    Hi Elizabeth, no this means a other feature. But your request is solved with this topic.

Please sign in to leave a comment.