Beas Master and Slave Incorrect Time Captured and Distribution
Hi,
We have a customer that wants to use Master and Slave.
Scenario: Entered the Time Receipt as 4 Minutes but the total showing in the Work Order is 5 minutes which is an issue. Another issue is that there is no time distributed to the Master as the planned time is 0.014. Refer to the screenshot below.
Is there any configuration to change or is this a system issue?
Thanks.