Piecework in beas
Hi
Let’s consider this simple case – look at this item structure:

In this item structure C-E1-00001 we have one operation (no. 10) resource PR-SZP-UNI operation SZYCIE-WKLAD. In normal configuration, beas to evaluate item cost use method set in configuration wizard, like this:

So it takes reported operation time and multiplies it by resource cost (i.s. operating takes 20 minutes and resource cost rate is 0,27 cents per minute so total cost is 0,27*20=5,4).


What I am asking is to add possibility to insert fixed cost for doing operation independent from reported by resource time taken for operation, like for external operation where you can set fixet price per unit (i.e. in price list or UDF).
We want to set fixet price per unit that is taken for post calculation booking (regardles to reported by resource time) when we use our inside resources (not use external operation type but normal operation).
It is called piecework.