Batch control among routing Answered

How can we control the batch cross all routing?

We need several routing to make our product from raw material to finished goods.

We need to control the batch number from raw material to finished goods.

For example,

Step 1: Input raw material into routing A using Batch 01.

Step 2: Output semi-finished goods from routing A using Batch 01.

Step 3: Input Batch 01 into routing B.

Step 4: Output Batch 02 from routing B.

How can we record these batch numbers?

Thanks.

 