MRP calculation
Hi,
it is required to activate in the MRP calculation the possibility that the quantity in purchase order is assigned only to the production order/position indicated at the order line level. (even if the quantity in order is greater then the requirement)
3
Please sign in to leave a comment.
Comments
0 comments