Alternative management of Scrap quantities at the time of posting product to stock

Answered

Comments

2 comments

  • Avatar
    Ana Bracho

    Hi Luigi

    Thanks for writing.

    We will plan include an improvement of the scrap management, we will analyzing this topic at the second half of the year.

    best regards

    Comment actions Permalink
  • Avatar
    Damiano Tibaldini

    Hi Luigi,

    I'd like to add some questions, suggestions and features request, since the development is at the beginning:

    1- New parameter for Scrap management (THIS IS AN INITIAL CHOICE THAT CANNOT BE CHANGED ONCE FIRST WORK ORDER IS CREATED):

        This seems quite a strict lock, similar to SAP option of choosing continuous stock : is it so? Would it be possible to activate this feature on an existing DB, where work orders were created years ago?

     

    2- PER EVALUATION METHOD SELECTED AT THE CONFIGURATION WIZARD FOR POSTING ASSEMBLIES.

    Does this mean that it will evaluate the value of the scrap as a wip (with components and time receipt already issued) ?

     

    3- Process changes:To create a new item code representing the scrapped product. If scrap management is "Advanced" it is MANDATORY to assign this item code TO ALL PRODUCTS THAT ARE STOCK MANAGED AND HAVE A BOM.

     

    It would be amazing if the scrap article could be defined "on the fly" with some coding convention (a.e. finished product code + "-SCRAP"), not to be assigned as mandatory in master data. This item should be already assigned a generic quality control to generate a quality control order.

     

    Thanks!

    Comment actions Permalink

Please sign in to leave a comment.