work order: grouping entries
Manufacturing structure views
Workflow: Machine reports many interim reports. There can be many bookings in or out. If you want to expand an assembly, the clarity suffers. I have customers who have several hundred interim reports.
Idea:
If there are more than 5 entries, then an intermediate level with "bookings in" and "bookings out" as with "journal entries"
With machine manufacturers, you quickly have over 1000 material items. Here, too, grouping should be done if there are too many, e.g. if there are over 50 items, then group or have an entry/button from line 20: "load more"
With BEAS 2025.2, things are already so fast that you don't have any performance problems, but it would be much clearer.
6
Please sign in to leave a comment.
Comments
0 comments