Hi,
is their any particular configuration for Beas to considers multiple resources (same resource Grp) while executing APS for an operation in work order.
Scenario:
while performing cutting of 30000 units there are around 7 cutting machines available where only 2 are engaged with other order. what configuration is to be set for the system to realize the available machine to the assign to the said order of 30000 units at the time of APS.
please guide me in case of such confuguration is to be set before hand
-
eine einfache Variante:
Definieren Sie in der Ressource die Anzahl der Maschines, example 11

in the resource you can define the count of machines to use for this routing position
you can define this as maximal number or percent.
if you define 100%, the APS use allways the max. available count of ressources.
Note:
With this concept you can't plan on which exact machine the user has to work. All other limitations see inside the documentation.
But for simple planing this is a good variant.Exact planing (which exact machine on which time) is not supported.
Theoretical you can use parallel resources. But this is complex to administrate.regards
Martin