How to manual create sub work order for current work order
Hi All,
Is it possible to create a sub work order for current work order, this reprocess steps is:
1. Select current work order
2. Use right menu > New Assembly, create a new work order
3. But it on same level, like this:

What I expect is like this:

Any suggestion?
BR
Robin
1
-
Hi Robin,
the sub level is always linked with bill of material position of the first position.
if you want to add a additional sub level, you must insert the (order related) assembly as Bill of Material position in the first level.
Alternative: No. Because otherwise the linking not working.
regards
Martin