Skip to main content

How to manual create sub work order for current work order

Comments

1 comment

  • Martin Heigl

    Hi Robin,

    the sub level is always linked with bill of material position of the first position.

    if you want to add a additional sub level, you must insert the (order related) assembly as Bill of Material position in the first level. 

    Alternative: No. Because otherwise the linking not working.

    regards

    Martin

Please sign in to leave a comment.