External Operation: subcontracting as part of the production order
Dear all,
in case of external operation inside a workorder ( in the middle) with other privious or next internal operations
it could be great to implement something to automate inventory mouvements for new "sub_assembly " . You need to create "sub_OUT" and "sub_IN" first
Add to this way you'll also have the track and trace of each step of the WO
even with batch or serial management for sub_OUT and sub_IN if needed
the scenario could be something like that:
- final Item A_final
- B = component of A used in operation 10=INternal
- C = component of A used nn operation 20=EXternal
- Op 10 internal drilling
- Op 20 extarnal painting
- Op 30 internal finishing
operation 10 consumes item B but create a "new"item "sub_A_10_OUT" that is component B drilled
for next operation 20 you need to provide component C but also "sub_A_10_OUT"
creation of a service PO as standard
than on external whs you'll have the consumption of component C and sub_A-10_OUT
and a posting of new item "sub_A-20_IN" as result of the external Process
at operation 30 you'll need to consume "sub_A-20_IN" to complete tha real item A_final
hope you'll enjoy
Thanks
Massimo