beas QC- Option by beas script create QC-Order by different logic

Tim Wehrle

Situation:: One item with one main QC-Plan and an additional (parallel) QC-Plan. When doing GRPO 2 QC-Order will be generated based on setting in beas configuration wizard (e.g. per good receipt document)

Idea: Insert a script in one of the QC-Plan which overwrite the logic from configuration wizard with the possibility to generate one QC-Order by Batch and the other by default logic (per good receipt document).

 

Thanks.

Comments

2 comments

  • Comment author
    Martin Heigl

    Hi Tim, 
    You mean: i can define with Script "use this concept" or "use other concept"
    But always one QC Order? 

    regards
    Martin

     

    0
  • Comment author
    Tim Wehrle

    Yes. "different concepts" for each QC-Plan. At the Moment it`s one Concept as General Setting for every QC-Plan.

    0