The following settings can be made in the "General" area of the "Setup" dialog:

  • Show or hide links between production order lines to control the visibility of dependencies.

  • Include or exclude standby operations in the histogram to tailor capacity insights to your planning preferences.

  • Display a progress bar on operations and choose whether progress is calculated based on time consumed or quantity produced. When using quantity-based progress, the system derives the consumed quantity from the input quantity—factoring in scrap if applicable.

  • Specify whether an info symbol should be shown on production order routing lines when additional information has been added to those lines in Business Central.