Halim Cemal Bayram
- Actividad total 6
- Última actividad
- Miembro desde
- Siguiendo 0 usuarios
- Lo siguen 0 usuarios
- Votos 0
- Suscripciones 3
Resumen de la actividad
Última actividad de Halim Cemal Bayram-
Halim Cemal Bayram creó una publicación,
Quality Control Reports for analysis
A report set for quality control analysis is needed in the system. It could be in the same logic as production reports.
-
Halim Cemal Bayram creó una publicación,
Date entry is needed when closing a position at work order
The work order close date is by default as system date but this closing could be done by non operator users such as planning or financial personnel after a while. This may cause the record of closi...
-
Halim Cemal Bayram creó una publicación,
time entry with beas script
RespondidaDear experts, hi to all, My SAP B1 version is 9.2 PL 08 and Be.as version is 9.2(5.29) PL:05 HF:5 I am trying to run 2 scripts; one to start a time time entry and one to end it. I don't have any pr...