Journal entry reference column
RespondidaDear support, Would be possible to pass the "AUFTRAG" value from the BEAS_FTHAUPT table as the REFERENCE2 in the journal entry, just like for the WIP Variance row ? Thanks in advance Peter
-
Beas freezes during Capacity planning
RespondidaDear support, I have noticed a strange situation. When I Add/delete resource on the Work order position an background process is started and most probably it is the capacity planing (because it is...
-
Terminal applications are missing
RespondidaDear support, I am testing the newest beas release (9.3 (2.83) PL:02 HF:4) ) on SAP 9.3 PL11 and I am missing the terminal applications. So when I log in with user the windows is empty. The access ...
-
Class name not found
RespondidaDear support, I have a problem when I am strating the beas add-on from the SAP. The error is: "Class name not found" Beas is working fine outside from the SAP. My SAP version is: 9.3 PL:11 (64bit) ...
-
Good Receipt cancellation
RespondidaDear support, I would like to ask, if the good receipt contain a batch number (we received it with batch) then if we would like to cancel that receipt, the cancellation option is not visible, I gue...
-
Delete / Add / routing using Beas script
RespondidaDear all, I would like to ask If is possible using beas script delete / add routing under the Work order ? Thanks in advance, Regards, Peter
-
Different Precalculation / Batch calculation result
RespondidaDear support, I would like to ask about the Pre / batch calculation result In the "precalculation" the "Direct Material Costs (DM)" considering the Scrap value also, while in the batch calculation ...
-
Modify the UDF field size
RespondidaDear support, The size of the UDF fields under the Interruptions (BEAS_APLATZ_STILLSTAND) is only for 50 characters. Is it possible to change (using the configuration wizard) or is only possible to...
-
Event aftert the routing has been successfully deleted
RespondidaDear support, Is it possible to execute an event after when the removing of the routing has been finished successfully? If yes, which is that event ? Thanks in advance, Regards,
-
View the POS_ID and sort by this field
RespondidaDear support, Is it possible to change the view on routing level, to see the POS_ID instead of the Op. Sequnce ID and sort it by the POS_ID in ascending. Thanks in advance,