Andre Schoenebeck
Resumen de la actividad
Última actividad de Andre Schoenebeck
-
Andre Schoenebeck hizo un comentario,
30218 - it is a setting we already have
- Ver comentario
- -1 votos
-
Andre Schoenebeck creó una publicación,
Personnel - holiday planning, crew management
Currently, planned absences can be entered only per employee Request: enter holidays or other absences for several employees at once, graphical calendar view for manpower scheduling for the complet...
- Andre Schoenebeck
- 5 seguidores
- 0 comentarios
- 7 votos
-
Andre Schoenebeck creó una publicación,
Variable density
Various material can have significant density changes depending on temperature, moisture etc. Currently, we have only a fix conversion of UoM for density saved to item master. Request: use the fiel...
- Andre Schoenebeck
- 2 seguidores
- 1 comentario
- 3 votos
- No planeada
-
Andre Schoenebeck creó una publicación,
BoM with 40 levels
BoM with 40 levels needed. Currently, there is a limitation of 21 levels. Item structures wìth >21 levels can be created, but if a WO is created from such a structure only the first 21 levels are c...
- Andre Schoenebeck
- 2 seguidores
- 1 comentario
- 0 votos
- Respondida
-
Andre Schoenebeck creó una publicación,
Post-calculation with more info
Fill the post calculation structure window with more information on the right next to COGS plan/actual display per row information from recent time receipts, used material. Similar to WO structure....
- Andre Schoenebeck
- Editado
- 4 seguidores
- 5 comentarios
- 2 votos