APS View - Inconsistency with checkbox

Julieta Oberti

Hi

I´m writting due to a possible bug. I´ve tried in diffrent databases with diffrent Beas versions (including the latest) and the bahaviour repeats. The thing is, when I set a wo position in APS to "planned" automatically the checkbox of "scheduling" is unchecked. However, it does not affect configuration of the position or funcionality, it is just disorienting. 

Whatsmore, if I close and reopen the window both checks are ticked. Therefore, it is not crucial or inconvinient, it is just that arises doubts.

 

Thanks in advance,