Can BEAS APS support the 2 requirements of injection industry?
English:
Can BEAS APS support the 2 requirements of injection industry below:
-
About resource group settings: According to the Ton of resource, is it possible a machine belong to 2 adjacent resource groups?
In this way, when automatic production scheduling, the scope of consideration can be wider and the resource utilization rate can be improved. 150T group (150T, 160T, 180T) 200T group (180T, 200T)
-
Setting of scheduling priority: A set of molds to produce products of different colors, have multiple work orders, needs to be scheduled on the same machine.
Whether the standard function of automatic production scheduling will consider the mold information of the previous and subsequent work orders (for example: occupied by other work orders; the front and back work orders are the same set of molds), especially the work orders that do not need to change the mold and only need to change the color, whether the system will be prioritized on the same machine.
中文:
BEAS APS 是否支持以下 APS 需求:
-
关于资源组的设置: 按照吨位区分,同一台机器,可否出现在相邻的2个资源组内?这样在自动排产时,考虑的范围可以更广,提高资源利用率。 150T组(150T,160T,180T) 200T组(180T,200T)
-
排产优先级的设置: 对同一套模具生产不同的颜色的产品(会有多个工单),需要放在同一台机器上排产。
自动排产的标准功能是否会考虑前、后工单的模具信息(例如:被其他工单占用;前后工单为同一套模具),特别是无需换模只需换色的工单,系统是否会优先排在同一台机器上。
如果标准功能中没有,那么开发可否实现?