
Andre Schoenebeck
- Total activity 16
- Last activity
- Member since
- Following 0 users
- Followed by 0 users
- Votes 2
- Subscriptions 6
Posts
Recent activity by Andre Schoenebeck-
Personnel - holiday planning, crew management
Currently, planned absences can be entered only per employee Request: enter holidays or other absences for several employees at once, graphical calendar view for manpower scheduling for the complet...
-
Variable density
Not plannedVarious material can have significant density changes depending on temperature, moisture etc. Currently, we have only a fix conversion of UoM for density saved to item master. Request: use the fiel...
-
BoM with 40 levels
AnsweredBoM with 40 levels needed. Currently, there is a limitation of 21 levels. Item structures wìth >21 levels can be created, but if a WO is created from such a structure only the first 21 levels are c...
-
Post-calculation with more info
Fill the post calculation structure window with more information on the right next to COGS plan/actual display per row information from recent time receipts, used material. Similar to WO structure....