Build | Produce / Manager production order detail view |
Produce / Manager transaction details |
Produce / Operator operation detail view |
Produce / Operator PDC workflow Step 3 |
Produce / Operator PDC workflow Step 5 |
SBO (w. Time per Resource Units = 1; Res. Units per Time Period = 1) |
SBO (w. any resource master data) |
Setup time (operation plan) |
Setup time | Additional Quantity (BoM) Additional Qty (production order) Additional Time (production order) |
Additional Time (production order) |
||||
Job time (operation plan) |
Base Qty (BoM, production order) |
||||||
Planned Qty (production order) |
|||||||
Planned time | Production time (production order) |
Production time (production order) |
|||||
Expected time (rounded to integer) |
Expected time | Run time (production order) |
Run time (production order) |
||||
Calculated time | |||||||
Duration | <last content of the timer> | Time spent | Time spent | ||||
Used time (production order detail view) |
Time (for manually issued resources) |
Completed time (for manually issued resources) |
Time (for manually issued resources) (is equal to Calculated time, unless edited manually) |
Issued | |||
Resource time (for manually issued resources) |
|||||||
Expected |