Beas provide a report to see how a automatic time was calculated on the time receipt.
At the time receipt click in the icon next to Duration, "calculation results" is available.
Automatic duration time is calculated considering parameters at the configuration wizard: "parallel calculation" and time linking.
When you click in calculation result you can see how the time was calculated in a report
Parallel now include the additional wo numbers used to distribute the time:
Added more information after delete an active work order time...